The Iloilo Flood Control Project is running in full swing and it looks like the project might be finished on time based from the latest accomplishment reports and a general physical assessment of their construction sites.
Here are some updates on the Iloilo Flood Control Project:
Construction of the 4.75km Jaro Floodway, which will provide a channel from the floodplains of Pavia-Jaro to the Iloilo Strait.

Continue Reading »
An eight-kilometer boulevard is up for development in Iloilo City as part of the second phase of the multi-billion Iloilo Flood Control Project (IFCP).
City Mayor Jerry Treñas said the proposed boulevard will start at the Carpenters Bridge in Tabucan, Mandurriao up to Forbes Bridge in Lapaz district. Continue Reading »
Latest updates about Iloilo Boulevard
Project Details: Inspired from the Baywalk concept along Roxas Boulevard in Manila, Iloilo will be having it’s own 8km “Iloilo Boulevard” constructed, which will start from the back of Gaisano City in La Paz all the way to the New Carpenters Bridge in Brgy. Tabucan, Mandurriao

Components of the Proposed Iloilo Boulevard
Continue Reading »